Plan 2007
Work items of Run, Event and Detector WG. M. Asai (05/Feb/2007 - proposed to SB)
Schedule (1) by June 2007, (2) by December 2007
-
Parallel navigation (collaborating with Geometry and Generic Processes WGs) 1.1 Finalize the implementation (1) 1.2 Update documents (1) 1.3 New example (1)
-
Event biasing (collaborating with Geometry and Generic Processes WGs) 2.1 Contribute to the design (1)/(2) 2.2 Update documents (1)/(2) 2.3 New examples (1)/(2)
-
Scoring 3.1 Unify scoring mechanisms of non-biasing and biasing options (1) 3.2 Update existing documents and examples (1) 3.3 New examples in particular with parallel navigation (1)/(2) 3.4 Drop obsolete scoring processes for geom-biasing (2)
-
Parallelization 4.1 Test with variety of applications (1)/(2) 4.2 Add support to interactive parallelism (2) 4.3 Add automatic transparent checkpointing of parallel jobs (2)
-
Reverse Monte Carlo (collaborating with Geometry and Generic Processes WGs) 5.1 Contribute to the design (1)/(2)
-
Study items 6.1 Physics list (or process manager) per region